Product Details:
|
|
Place of Origin: | Chuzhou China |
---|---|
Brand Name: | Chuzhou HH non-woven |
Certification: | CE |
Model Number: | SMS SMMS SSMMS S SS SSS |
Payment & Shipping Terms:
|
|
Minimum Order Quantity: | 1 set |
Price: | negotiable |
Packaging Details: | wood box and machine wrapping with PE film keep cargo safe |
Delivery Time: | For detailed talk |
Supply Ability: | For detailed talk |
Detail Information |
|||
Product Name: | SMMS Non Woven Fabric Production Line 4000 | Application: | Manufacturing Plant |
---|---|---|---|
Effective Width: | 4000 Mm | Gsm Rang: | 9 - 100 G |
Daily Output: | 30 Ton Smms Roll | Finished Product: | SMMS Fabric Roll |
Service: | Dedicated Engineer On Line Support | Machine Weight: | 110 Ton |
Highlight: | SS Spunbond Machine,SMMS Spunbond Machine |
Product Description
Top Grade SS SMMS PP Spunbonded Fiber Nonwoven Fabric Making Spunbond Machine Non Woven Fabric Production Line
Introduction to the composition of the meltblown production line
4000 SMMS Model
Effective Width | 4000mm |
Weight Range | 9 - 100 g / ㎡ |
Out put daily | 30 ton |
Machine speed | ≦ 450 m / min |
Transformer | ≈ 2500 KVA |
Power Consumption | 1700º - 1900 º / Ton |
Machine Size | 55 *28* 12 M |
Model | Effective width | Daily capacity | Speed | Spinning system | GSM Range | Machine dimension Length*Width*Height |
HH-1600M | 1600MM | 2000Kg | 70M/Min | Meltblown | 15-300 | 18*10*10 meter |
HH-2400M | 2400MM | 3000Kg | 18*11*10 meter | |||
HH-3200M | 3200MM | 4500Kg | 18*13*10 meter | |||
HH-1600S | 1600MM | 5000Kg | 150M/Min |
Spunbond (S) |
9-250 | 18*8*12 meter |
HH-2400S | 2400MM | 7000Kg | 18*10*12 meter | |||
HH-3200S | 3200MM | 10000Kg | 18*15*12 meter | |||
HH-1600SS | 1600MM | 9000Kg | 350M/Min |
Spunbond (SS) |
8-150 | 45*15*12 meter |
HH-2400SS | 2400MM | 13000Kg | 45*18*12 meter | |||
HH-3200SS | 3200MM | 16000Kg | 45*20*12 meter | |||
HH-1600SSS | 1600MM | 12000Kg | 550M/Min |
Spunbond (SSS) |
9-120 | 50*15*12 meter |
HH-2400SSS | 2400MM | 16000Kg | 50*18*12 meter | |||
HH-3200SSS | 3200MM | 24000Kg | 50*20*12 meter |
Parts of spunbonded nonwoven fabric production line:
Recycle extrude→Main extruder→Filter→Metering pump→Monomer suction device→spinning box( Changzhou/ENKA/KASEN spinneret )→Quenching air chamber→stretching device→Web former→Calender→Winder→Slitter
Spunbonded process and technical flow chart:
Additive(Recycling off-cut fabric)→Raw material→Melting→Filtering→Measuring→Spinning→Cooling→Stretching→Web forming→Calendering→Winding→Cutting→Final product
Parts of Melt blown nonwoven fabric production line:
Main extruder→filter→Metering pump→Air heating system→Melt blown sprayer (ENKA sprayer)→Web former→Winder→Slitter
Melt blown process and technical flow chart:
Raw material →Melting→Filtering→Measureing→Air heating→Spraying→Web forming→Winding→Cutting→Final product
Working process
Mainly componet
Aperture (1pc) | 90 300 kg / h |
The screw L/D of the main extruder | 30:1 |
The screw L/D of the ancillary extruder | 15:1 |
Maximum temperature | 300 ℃ |
Max. Output | 200 kg / h |
Heating zone | 8 tod |
Perforated length | 3,350 mm |
HPI | 40 |
Number of holes | 5,276 |
1 Set L/D | 10 |
Capillary diameter | 0.3mm |
Capillary length | 3,600mm |
Spinning box ,is one of most import parts of the non-woven fabric manufacturing machine. PP material through the spinning box is spun into countless strands of silk .
Advanced CNC tools
Exhibition show
Packing and delievery
FAQ
1. Q:How long will your engineer reach our factory?
A:Within one week after everything ready (machine arrival your factory, non woven material, power source, air compressor etc.Prepared)
2. Q:Does your engineer understand English?
A:Our engineers understand a little English. All our engineers have more than five years machine installation experience.
3. Q:What should we charge for your engineer?
A:You should charge for the cost of our engineer's air tickets, hotel, food, and also their salary 800CNY one day per person.
4. Q:How many days it will take for the intallation?
A: It will take around 45 days, depends on the machine type.
5. Q:How do we solve the machine problem after your engineer leaving?
A:Generally speaking, there will be no problem after finishing installation. In case you have any problem, you can contact our sales at any time. Our engineers will take a solution video according your description.
Enter Your Message